How to keep the asphalt mixing station stable?
First of all, the selection of the delivery pump in the asphalt mixing station must meet the requirements of the maximum asphalt pouring time, the highest height, and the maximum horizontal distance per unit time during construction. At the same time, there must be a certain technical and production capacity reserve, and the balanced production capacity is 1.2 to 1.5 times as the best.
Learn More
2024-08-06